SENTRAL SENAYAN I





SENTRAL SENAYAN I

Building Features :

Official opening October 1997
Total floors 18 Stories + 1 basement
Construction Reinforced concrete core wall and floors with pre-stressed beams.
Tempered glass curtain wall + safety film at ground and mezzanine floor. Granite cladding on ground and mezzanine floor pillars and beams.
Power Supply 3030 kVA main electricity supply
2,447 kVA building electrical load assumption
Back-up Power 100 % back-up capacity
Air Conditioning Central water cooling system
24 hours chilled water available for server room
Lighting 500 lux illumination on typical floors
Telecommunication Vertical shaft for fiber optic and standard cable
Lift

8 Passenger Lifts
4 lifts per zone

Low Zone: GF, 3F – 11/F
20 persons/1350 kg load capacity 120m/min

High Zone: GF, 11/F – 18/F
20 persons/1350 kg load capacity 210m/min

1 Service Lift, Basement – 18/F
24 persons/1600 kg load capacity 90m/min

Car Park Building #1,2 lifts, 750 kg load capacity
Fire & Safety Heat and smoke detector alarms, automatic fire alarm, fire hydrant and fire extinguishers, sprinkler system, exit signs, public address system, 2 fire stairs with double handrails, emergency lighting and pressurized fresh air.
Executive Toilet Available per floor, 3/F – 18/F, with shower cubical and hot water
Public Toilet Available per floor, GF – 18/F except 2/F (mezzanine floor)
Pantry & Ablution Available per floor, 2/F (mezzanine floor) – 18/F
Car Parking Available in car park building 1, 7 floors, approximately 700 lots and Plaza Senayan’s car park building
  Sentral Senayan I
Developer & Manager PT Senayan Trikarya Sempana
Main Contractor PT Kajima Indonesia
Design architects & Engineers Kajima Design, Japan
Kajima Design Asia, Singapore
Project Architects PT Airmas Asri
Structural Engineers PT Wiratman & Associates
M/E Engineers PT Arnan Pratama Consultant